Free tool · Planning

Do your solar panels need planning permission?

Check it yourself, the way we do: the postcode against the national heritage map, then the national rules, one roof slope at a time. Every answer shows its reasoning and its source.

What's the postcode?

We check it against the national planning map for conservation areas, listed buildings, Article 4 directions and other protected land.

How the check works

  1. National law. Domestic roof solar is usually permitted development (GPDO 2015, Schedule 2, Part 14, Class A), within a 20 cm projection limit.
  2. Protected land. On Article 2(3) land, including conservation areas designated under s.69 of the 1990 Act, panels on a slope facing a highway lose that right.
  3. Local maps. We cross-check the postcode against council designations published nationally, then ask you to confirm what the map can't see: property type, which slopes face the street, covenants.

Worked example: read our W5 case study, where a house in the Haven Green Conservation Area split into a permitted rear roof and a front roof needing full permission.

Common questions

Do solar panels need planning permission?
On most houses in England, no: roof panels are permitted development under Schedule 2, Part 14, Class A of the GPDO 2015, provided they project no more than 20 cm and are sited to minimise visual impact.
What changes in a conservation area?
Conservation areas are Article 2(3) land. Panels on a roof slope or wall that faces a highway are not permitted development and need full planning permission. Rear and hidden slopes usually remain permitted development.
Can I put solar panels on a flat?
Flats and maisonettes have no householder permitted development for solar, so full planning permission is needed, plus consent from the freeholder or under the lease.
How can I be certain?
Apply to your council for a Lawful Development Certificate, which formally confirms the work is permitted development.